Skip to content
ATO Pathways
Log In
Overview
Search
Catalogs
SCAP
OSCAL
Catalogs
Profiles
Documents
References
Knowledge Base
Platform Documentation
Compliance Dictionary
Platform Changelog
About
Catalogs
XCCDF
Network Infrastructure Policy Security Technical Implementation Guide
NET-IDPS-027
NET-IDPS-027
An XCCDF Group - A logical subset of the XCCDF Benchmark
Details
Profiles
Prose
NET-IDPS-027
1 Rule
<GroupDescription></GroupDescription>
Products collecting baselines for anomaly-based detection must have their baselines rebuilt based on changes to mission requirements such as Information Operations Conditions (INFOCON) levels and when the traffic patterns are expected to change significantly.
Low Severity
<VulnDiscussion>Administrators should ensure that any products collecting baselines for anomaly-based detection have their baselines rebuilt periodically as needed to support accurate detection. The ISSM is required to have the enclave prepared for readiness by raising INFOCON levels prior to an activity to ensure the network is as ready as possible when the operation or exercise begins. Because system and network administrators implement many of the INFOCON measures over a period of time in a pre-determined operational rhythm, commanders should raise INFOCON levels early enough to ensure completion of at least one cycle before the operational activity begins. Recommendations for possible INFOCON changes should be written into Operation Plans (OPLAN) and Concept Plans (CONPLAN). Guidelines can be found in Strategic Command Directive (SD) 527-1.</VulnDiscussion><FalsePositives></FalsePositives><FalseNegatives></FalseNegatives><Documentable>false</Documentable><Mitigations></Mitigations><SeverityOverrideGuidance></SeverityOverrideGuidance><PotentialImpacts></PotentialImpacts><ThirdPartyTools></ThirdPartyTools><MitigationControl></MitigationControl><Responsibility></Responsibility><IAControls></IAControls>