Skip to content

CM-2: Baseline Configuration

An OSCAL Control

Statement

    • a.

      Develop, document, and maintain under configuration control, a current baseline configuration of the system; and

    • b.

      Review and update the baseline configuration of the system:

      • 1.

        ;

      • 2.

        When required due to ; and

      • 3.

        When system components are installed or upgraded.

      • (b) (1) Guidance:

        Significant change is defined in NIST Special Publication 800-37 Revision 2, Appendix F.