Skip to content

CP-4.2: Alternate Processing Site

An OSCAL Control

Statement

    • Test the contingency plan at the alternate processing site:

      • (a)

        To familiarize contingency personnel with the facility and available resources; and

      • (b)

        To evaluate the capabilities of the alternate processing site to support contingency operations.