I - Mission Critical Classified
Rules and Groups employed by this XCCDF Profile
-
SRG-NET-000336-NAC-001390
<GroupDescription></GroupDescription>Group -
Forescout must be configured with a secondary log server, in case the primary log is unreachable. This is required for compliance with C2C Step 1.
<VulnDiscussion>It is critical for the appropriate personnel to be aware if a system is at risk of failing to process audit logs as required....Rule Medium Severity -
SRG-NET-000512-NAC-002310
<GroupDescription></GroupDescription>Group -
Forescout must perform continuous detection and tracking of endpoint devices attached to the network. This is required for compliance with C2C Step 1.
<VulnDiscussion>Continuous scanning capabilities on the NAC provide visibility of devices that are connected to the switch ports. The NAC con...Rule Medium Severity -
SRG-NET-000148-NAC-000620
<GroupDescription></GroupDescription>Group
Node 2
The content of the drawer really is up to you. It could have form fields, definition lists, text lists, labels, charts, progress bars, etc. Spacing recommendation is 24px margins. You can put tabs in here, and can also make the drawer scrollable.
Capacity
Modules