I - Mission Critical Classified
Rules and Groups employed by this XCCDF Profile
-
SRG-OS-000046
<GroupDescription></GroupDescription>Group -
The operating system must alert the ISSO and SA (at a minimum) in the event of an audit processing failure.
<VulnDiscussion>It is critical for the appropriate personnel to be aware if a system is at risk of failing to process audit logs as required....Rule Medium Severity -
SRG-OS-000047
<GroupDescription></GroupDescription>Group -
The operating system must shut down by default upon audit failure (unless availability is an overriding concern).
<VulnDiscussion>It is critical that when the operating system is at risk of failing to process audit logs as required, it takes action to mit...Rule Medium Severity -
SRG-OS-000051
<GroupDescription></GroupDescription>Group
Node 2
The content of the drawer really is up to you. It could have form fields, definition lists, text lists, labels, charts, progress bars, etc. Spacing recommendation is 24px margins. You can put tabs in here, and can also make the drawer scrollable.
Capacity
Modules