Skip to content

I - Mission Critical Classified

Rules and Groups employed by this XCCDF Profile

  • SRG-OS-000342

    <GroupDescription></GroupDescription>
    Group
  • The operating system must offload audit records onto a different system or media from the system being audited.

    &lt;VulnDiscussion&gt;Information stored in one location is vulnerable to accidental or incidental deletion or alteration. Off-loading is a common...
    Rule Low Severity
  • SRG-OS-000343

    <GroupDescription></GroupDescription>
    Group
  • The operating system must immediately notify the SA and ISSO (at a minimum) when allocated audit record storage volume reaches 75 percent of the repository maximum audit record storage capacity.

    &lt;VulnDiscussion&gt;If security personnel are not notified immediately when storage volume reaches 75% utilization, they are unable to plan for a...
    Rule Low Severity
  • SRG-OS-000344

    <GroupDescription></GroupDescription>
    Group
  • The operating system must provide an immediate real-time alert to the SA and ISSO, at a minimum, of all audit failure events requiring real-time alerts.

    &lt;VulnDiscussion&gt;It is critical for the appropriate personnel to be aware if a system is at risk of failing to process audit logs as required....
    Rule Medium Severity
  • SRG-OS-000348

    <GroupDescription></GroupDescription>
    Group
  • The operating system must provide an audit reduction capability that supports on-demand audit review and analysis.

    &lt;VulnDiscussion&gt;The ability to perform on-demand audit review and analysis, including after the audit data has been subjected to audit reduct...
    Rule Low Severity
  • SRG-OS-000349

    <GroupDescription></GroupDescription>
    Group
  • The operating system must provide an audit reduction capability that supports after-the-fact investigations of security incidents.

    &lt;VulnDiscussion&gt;If the audit reduction capability does not support after-the-fact investigations, it is difficult to establish, correlate, an...
    Rule Low Severity

The content of the drawer really is up to you. It could have form fields, definition lists, text lists, labels, charts, progress bars, etc. Spacing recommendation is 24px margins. You can put tabs in here, and can also make the drawer scrollable.

Capacity
Modules