Skip to content

I - Mission Critical Public

Rules and Groups employed by this XCCDF Profile

  • SRG-APP-000357-NDM-000293

    <GroupDescription></GroupDescription>
    Group
  • The DataPower Gateway must allocate audit record storage capacity in accordance with organization-defined audit record storage requirements.

    &lt;VulnDiscussion&gt;In order to ensure network devices have a sufficient storage capacity in which to write the audit logs, they need to be able ...
    Rule Medium Severity
  • SRG-APP-000359-NDM-000294

    <GroupDescription></GroupDescription>
    Group
  • The DataPower Gateway must generate an immediate alert when allocated audit record storage volume reaches 75% of repository maximum audit record storage capacity.

    &lt;VulnDiscussion&gt;If security personnel are not notified immediately upon storage volume utilization reaching 75%, they are unable to plan for ...
    Rule Low Severity
  • SRG-APP-000360-NDM-000295

    <GroupDescription></GroupDescription>
    Group
  • The DataPower Gateway must generate an immediate real-time alert of all audit failure events.

    &lt;VulnDiscussion&gt;It is critical for the appropriate personnel to be aware if a system is at risk of failing to process audit logs as required....
    Rule Low Severity
  • SRG-APP-000371-NDM-000296

    <GroupDescription></GroupDescription>
    Group
  • The DataPower Gateway must compare internal information system clocks at least every 24 hours with an authoritative time server.

    &lt;VulnDiscussion&gt;Inaccurate time stamps make it more difficult to correlate events and can lead to an inaccurate analysis. Determining the cor...
    Rule Low Severity
  • SRG-APP-000372-NDM-000297

    <GroupDescription></GroupDescription>
    Group
  • The DataPower Gateway must synchronize internal information system clocks to the authoritative time source when the time difference is greater than one second.

    &lt;VulnDiscussion&gt;Inaccurate time stamps make it more difficult to correlate events and can lead to an inaccurate analysis. Determining the cor...
    Rule Low Severity
  • SRG-APP-000373-NDM-000298

    <GroupDescription></GroupDescription>
    Group
  • The DataPower Gateway must be configured to synchronize internal information system clocks with the primary and secondary time sources located in different geographic regions using redundant authoritative time sources.

    &lt;VulnDiscussion&gt;The loss of connectivity to a particular authoritative time source will result in the loss of time synchronization (free-run ...
    Rule Medium Severity
  • SRG-APP-000374-NDM-000299

    <GroupDescription></GroupDescription>
    Group
  • The DataPower Gateway must record time stamps for audit records that can be mapped to Coordinated Universal Time (UTC) or Greenwich Mean Time (GMT).

    &lt;VulnDiscussion&gt;If time stamps are not consistently applied and there is no common time reference, it is difficult to perform forensic analys...
    Rule Medium Severity
  • SRG-APP-000379-NDM-000303

    <GroupDescription></GroupDescription>
    Group
  • The DataPower Gateway must implement organization-defined automated security responses if baseline configurations are changed in an unauthorized manner.

    &lt;VulnDiscussion&gt;Unauthorized changes to the baseline configuration could make the device vulnerable to various attacks or allow unauthorized ...
    Rule Medium Severity
  • SRG-APP-000380-NDM-000304

    <GroupDescription></GroupDescription>
    Group
  • The DataPower Gateway must enforce access restrictions associated with changes to device configuration.

    &lt;VulnDiscussion&gt;Failure to provide logical access restrictions associated with changes to device configuration may have significant effects o...
    Rule Medium Severity
  • SRG-APP-000381-NDM-000305

    <GroupDescription></GroupDescription>
    Group
  • The DataPower Gateway must audit the enforcement actions used to restrict access associated with changes to the device.

    &lt;VulnDiscussion&gt;Without auditing the enforcement of access restrictions against changes to the device configuration, it will be difficult to ...
    Rule Medium Severity

The content of the drawer really is up to you. It could have form fields, definition lists, text lists, labels, charts, progress bars, etc. Spacing recommendation is 24px margins. You can put tabs in here, and can also make the drawer scrollable.

Capacity
Modules