Skip to content

II - Mission Support Sensitive

Rules and Groups employed by this XCCDF Profile

  • CS-06.03.02

    Group
  • Protected Distribution System (PDS) Monitoring - Initial Inspection

    A PDS that is not inspected, monitored and maintained as required could result in undetected access, sabotage or tampering of the unencrypted transmission lines. This could directly lead to the los...
    Rule Low Severity
  • EC-01.02.01

    Group
  • Environmental IA Controls - Emergency Power Shut-Off (EPO)

    A lack of an emergency shut-off switch or a master power switch for electricity to IT equipment could cause damage to the equipment or injury to personnel during an emergency. REFERENCES: DOD 522...
    Rule Medium Severity
  • EC-02.02.01

    Group

The content of the drawer really is up to you. It could have form fields, definition lists, text lists, labels, charts, progress bars, etc. Spacing recommendation is 24px margins. You can put tabs in here, and can also make the drawer scrollable.

Capacity
Modules